3 Ways To Prepare For A Septic Tank Installation
Septic professionals will do the bulk of the work when it comes to installing a new septic tank on your property, but you must do your part if you want to guarantee the long-term success of your septic tank.
Homeowners need to be prepared for the septic tank installation process by taking the required steps well before the installation day arrives.
You can do these three things to ensure you are ready for the installation of a quality septic tank that will serve your home well into the future.
1. Evaluate Your Household
The septic tank installation process should always begin with the evaluation of your household. The number of occupants residing in the home, the types of water-using appliances in the home, and the typical water usage of your family can all influence the size of your septic tank.
The last thing you want to do is install a tank that is too small since this will require that you invest in more frequent tank cleanouts. Being prepared with valuable information about your household will help a septic professional guide you to the tank that is best suited to meet your needs.
2. Identify a Drain Field
Drain fields play a vital role in the operation of a septic system. Your tank will be connected to your drain field, so these elements are usually installed simultaneously when you get a new septic system. You should take the time to walk around your property and identify an area that can successfully serve as a drain field.
Make sure that the drain field is located in an open area where nothing on the surface will compact the soil. You also want your drain field to be located away from any large trees or shrubs, as the roots of these plants can cause serious damage.
Your septic professional can help you identify the right location for both your septic tank and your drain field prior to installation.
3. Verify Your Paperwork
The installation of a new septic tank usually requires a permit from your local government.
City officials will want to be sure that all rules and regulations pertaining to septic systems are being followed during the installation process. You should be prepared to provide a map showing where each element of your septic system will be installed.
The size and construction of the tank you have chosen will also be reviewed during the permitting process. Verify that you have obtained all of the necessary permits prior to scheduling a tank installation so that your project isn't delayed.